Hardware delivery, on-site optical fiber installation & digital activation standards • Tara Maa Cable
Tara Maa Cable provides telecommunications and television broadcasting services that involve both physical hardware deployment and digital service activation at the subscriber's premises in Krishnagar City and Nadia district. This policy clarifies timelines, procedures, and conditions governing equipment delivery and service hand-over.
Physical hardware items provided during onboarding include:
Fiber Broadband Hardware: Optical Network Terminal (ONT) / Wi-Fi Router, optical fiber drop cable, optical patch cord, RJ-45 LAN cable, and DC power adapter.
SITI Cable Hardware: SITI Digital / HD Set-Top Box (STB), conditional access smart card (where applicable), HDMI cable or RCA 3-pin cable, universal remote control with batteries, and DC adapter.
All physical equipment is transported directly by our certified technicians during the scheduled installation visit in secure anti-static packaging. There are no courier or shipping fees for standard installations in our operational zones.
We take pride in having the fastest turnaround in Nadia:
Bhatjangla, Palpara, Krishnagar City Proper
Immediate fiber node tap availableSurrounding Nadia Suburban Paras
Subject to drop-cable run distanceEmergency Replacement (Damaged STB / ONT)
Technician visit on verified ticket| Location Area | Estimated Time to Installation | Service Availability |
|---|---|---|
| Bhatjangla, Palpara, Krishnagar City Proper | Within 2 to 4 Hours | Immediate fiber node tap available |
| Surrounding Nadia Suburban Paras | Within 6 to 12 Hours | Subject to drop-cable run distance |
| Emergency Replacement (Damaged STB / ONT) | Same Day (Under 4 Hours) | Technician visit on verified ticket |
Upon physical cabling and terminal setup:
Broadband Internet: Data credentials and IP session are provisioned within 15 minutes of splicing. The technician demonstrates live speed tests on the subscriber's personal devices.
SITI Cable TV: The Set-Top Box is paired with SITI headend servers via Over-The-Air (OTA) activation within 30 minutes of connecting the RF cable.
OTT Subscriptions: For broadband plans with bundled OTT (Hotstar, Zee5, SonyLIV, Hoichoi), activation SMS links and login OTPs are delivered to the registered mobile number within 2 to 6 hours of account creation.
If an optical fiber installation cannot be completed due to physical obstructions, landlord permission refusal, or distance exceeding optical power limits from the nearest splitter, the subscriber will be notified immediately, and 100% of any advance booking deposit will be refunded within 24 hours.
Delivery is deemed complete only after the technician conducts live speed testing, demonstrates SITI Cable TV reception, configures the subscriber's Wi-Fi network name (SSID) and password, and the subscriber signs the digital/paper Installation Acceptance Form.
Everything you need to know about scheduling, equipment handover, optical cable runs, and digital activation across Krishnagar City and Nadia district.
Our Krishnagar field engineering team is on standby to schedule your FTTH fiber drop, set up your dual-band Wi-Fi router, or connect your SITI HD Set-Top Box today.